The engineering and manufacturing expertise of Global Hydro’s headquarters in Austria was combined with the project execution and on-site expertise of its subsidiary in India. While the Austrian teams were responsible for key areas including hydraulic development, turbine engineering and runner manufacturing, the Indian subsidiary played a central role in the activities on site and project implementation in Guinea. Regular technical coordination, online meetings and joint site visits connected both teams throughout the project.
This close exchange was essential throughout the project. Precise information collected at the existing plant had to flow directly into engineering and design decisions. At the same time, solutions developed by the engineering teams had to take the actual conditions on site into account.
Donkéa demonstrates the advantage of Global Hydro's international setup: Regional project capabilities and centralized hydropower expertise work together as one team, bringing the right expertise to each stage of the project.