In 2023, a hydroelectric project in Indonesia with a total capacity of 6.4 MW was successfully completed. The two Francis turbines are designed for a head of 44.4 meters, each with a runner diameter of 1.1 meters. Despite the challenging conditions, including an earthquake, the installation and commissioning were successfully completed, once again demonstrating that Global Hydro is a reliable partner.
Power turbine [kW]: 3244
Number of Turbines: 2
Power plant [kW]: 6488
Head [m]: 44,4
Flow [m3/sec]: 8
Speed [rpm]: 500
Runner diameter [mm]: 1111
Tongar