thierry.burckhart@global-hydro.euIn 2023, a hydroelectric project in Indonesia with a total capacity of 6.4 MW was successfully completed. The two Francis turbines are designed for a head of 44.4 meters, each with a runner diameter of 1.1 meters. Despite the challenging conditions, including an earthquake, the installation and commissioning were successfully completed, once again demonstrating that Global Hydro is a reliable partner.
Niko Valle-Schmitz
COO Global Hydro Indonesia / Area Sales Manager
+62 811 7171237
niko.valle-schmitz@global-hydro.co.idPower turbine [kW]: 3244
Number of Turbines: 2
Power plant [kW]: 6488
Head [m]: 44,4
Flow [m3/sec]: 8
Speed [rpm]: 500
Runner diameter [mm]: 1111
Tongar